Can we bet back to what the sign and posted order state.
The order creates the context, however it is only traffic signs in the roads themselves which provide the detail i.e. extent and times of operation.
So what does the sign state?
No waiting from Mon.26 June to Friday 30 June, 8pm to 5am
RUTLAND ROAD
(Both sides from No.1- junction with Katherine Road).
Which is totally unclear.
1. No.1 and 'junction with Katherine Road' are not the same location, they're 120 feet from each other.
2. Is it intended that the restriction goes the full length of Rutland(we've got the 'from' but not 'to') and if so why the hell not just say 'Total length from Katherine Road to Shrewsbury...or is it, Rutland extends beyond Shrewsbury!
IMO, their photos are inconclusive as regards No.1, and if they want to claim the restriction actually started at the junction with Katherine then they'd be foolish to take this further.